Extension Nustar terminal St. Eustatius
Statia PetroBras Project Verwater is proudly to announce that we received the o...
ETT 3 project 465.000 cbm storage capacity
ETT 3 project for 465,000 m3 storage capacity. The ETT3 terminal will have a st...
Vopak Phase VIII
In September 2009 Vopak entrusted Verwater to build them 4 new, state of the art tanks....
MOT Europoort Rotterdam 3 off 120 000 m3 crude oil tanks
On the 16th of November, 2009 Maasvlakte Oil Terminal (MOT) began the expansion of thei...
ATPC Antwerp retrofit of the Petroplus site
At the end of last year Verwater was invited by VTTI to find a way to “retrofit&r...
Multi discipline project at Argos Terminal Rotterdam
In a joint effort all disciplines within Verwater are carrying out in close co-operatio...