Air Products

Project ‘GAN’ De bottleneck

Location: Botlek Rotterdam

Project: GAN De bottleneck

Duration: May - December 2019

Volume: €1,7 mio

Scope

  • Mechanical & Piping works
  • Electrical & Instrumentation

For the Botlek GAN Expasion project Verwater had to perform a broad spectrum of modifications and improvements to the existing Botlek plant. Piping shop fabrication and site erection, pipe testing, steelworks and E&I works were performed. Works were carried out safe and were performed within planned time schedule