Koole Tankstorage Botlek – Project Replacing piping systems TP8

Koole Tankstorage Botlek

  • Location: Koole Tankstorage Botlek
  • Project: Replacing piping systems TP8
  • Duration project: Sept - Dec 2019
  • Volume € 250.000
  • Scope
  • Prefab works
  • Piping works
  • Mechanical works
  • Coating works

In tankpit 8 (five tanks) at Koole Botlek the old pipingsystems were replaced for new. Verwater was responsible for the prefab, transport, demounting of existing piping systems and assembly of new piping systems and coating of new piping systems.