Koole Tankstorage Minerals – Project FO Manifold Kade 8

Koole Tankstorage Minerals

  • Location: Koole Minerals, Rotterdam Pernis
  • Project: FO Manifold Kade 8
  • Duration project: Sept - Dec 2019
  • Volume: € 1,9 mio
  • Scope:
    • Mechanical works
    • Piping works
    • Prefab works
    • Coating prefab

The scope of work for this project consisted of: demounting of existing piping, construction of new structurals, prefab and assembly of new piping system, assembly of new piping supports, coating of prefab pipingwork, hydrotesting. Works were carried out safe and were performed within planned time schedule.