Air Products
For the Botlek GAN Expasion project Verwater had to perform a broad spectrum of modifications and improvements to the existing Botlek plant. Piping shop fabrication and site erection, pipe testing, steelworks and E&I works were performed. Works were carried out safe and were performed within planned time schedule.