Schermafbeelding 2024 03 20 om 10.32.35
Shell Denmark: Tank Maintenance: jacking and relocation

Shell Denmark

  • Location: Shell Fredericia
  • Disciplines:
    • Tank jacking
    • Relocation with SPMT’s
    • Replacement bottom
    • Civil works
    • Coating works
    • Project Management
  • Completion time: 11 months
  • Completion date: September 2019

During this project Verwater has taken the entire project management at its account. At first the tank was jacked, after which it was  relocated, using SPMT’s, to the temporary tank foundation. After placing the tank on the temporary foundation, the bottom was removed and a new bottom was placed. The current foundation and soil was excavated and rebuilt and the tank was relocated back to the new tank foundation. After the hydrotest, the bottom of the tank was gritblasted and internally coated up to 1 meter on the bottom ring of the wall. 

Afbeelding1